19-938: Authorize Supplemental Agreement No. 8 to the professional services contract with HDR Engineering, Inc. to provide additional engineering services for the design and construction of three bridges on Cadiz Street and Riverfront Boulevard to replace existing undersized box culverts within the Levee Drainage System - Sump A and to perform additional construction support services for the Able Storm Water Pump Station - Not to exceed $262,579.00, from $10,987,502.00 to $11,250,081.00 - Financing: Flood Protection and Storm Drainage Facilities Fund (2012 Bond Funds) ($215,789.00) and Wastewater Capital Improvement Fund ($46,790.00)
Dallas · 2019 · Introduced
Introduced June 20, 2019
Read the bill