18-700: Authorize a professional services contract with HDR Engineering, Inc. to provide engineering services for an alignment study and preliminary design report associated with the delivery of raw water from the Integrated Pipeline delivery point near Joe Pool Lake to the Bachman Water Treatment Plant - Not to exceed $2,695,000.00 - Financing: Water Utilities Capital Improvement Funds
Dallas · 2018 · Introduced
Introduced August 14, 2018
Read the bill