Civicly

20-1790: Authorize a construction contract for the installation of erosion control and storm drainage improvements at eight locations (list attached to Agenda Information Sheet) - Stoic Civil Construction, Inc., lowest responsible bidder of five - Not to exceed $4,522,689.50 - Financing: Flood Control (D) Fund (2017 General Obligation Bond Funds) ($3,161,623.50), Storm Drainage Management Capital Construction Fund ($879,875.00) and Flood Protection and Storm Drainage Facilities Fund (2006 General Obligation Bond Funds) ($481,191.00)

Dallas · 2020 · Introduced

Introduced September 10, 2020

Read the bill