22-257: Authorize a two-year agreement with automatic two-year renewals indefinitely, unless modified by mutual agreement between both parties, to consolidate all existing agreements with the Texas Department of Transportation for construction, maintenance, and operation of continuous highway lighting systems within a municipality with 100% of the operation and maintenance and the expense of the electrical energy consumed, being the responsibility of the City of Dallas at the following locations: Interstate Highway (IH) 635 from city limits west of 35E to city limits north of Walnut Hill Lane; IH 30 from city limits at Mountain Creek Bridge to US 80/IH 30 split; Loop 12 from Spur 408 to IH 30; Spur 408 from IH 20 to Loop 12; IH 35E from Commerce Street to IH 20; U.S. Route (US) 67 from IH 20 to IH35E; IH 45/345 from Botham Jean Boulevard to 0.3 miles east of Bexar Street; Texas State Highway 310 from US 175 to 0.3 miles south of US 175; and US 175 from east of Loop 12 to east city limits - Fi…
Dallas · 2021 · Introduced
Introduced December 28, 2021
Read the bill