Civicly

23-340: Authorize a construction services contract for the installation of erosion control and storm drainage improvements at 13 locations (list attached to the Agenda Information Sheet) - Austin Filter Systems, Inc., lowest responsible bidder of three - Not to exceed $8,452,506.00 - Financing: Storm Drainage Management Capital Construction Fund ($4,933,272.27), Flood Control (D) Fund (2017 General Obligation Bond Funds) ($2,327,720.73), Flood Protection and Storm Drainage Facilities Fund (2006 General Obligation Bond Funds) ($398,183.00), Flood Protection and Storm Drainage Facilities (2012 General Obligation Bond Funds) ($34,610.00), and Water Capital Improvement F Fund ($758,720.00)

Dallas · 2023 · Introduced

Introduced January 13, 2023

Read the bill