Civicly

19-1039: Authorize an increase in the construction services contract with Schneider Electric Buildings Americas, Inc., for additional electric equipment necessary for the emergency backup system and to perform an Arc Flash study required by the National Electric Code at Dallas City Hall located at 1500 Marilla Street - Not to exceed $447,626.00, from $2,814,907.00 to $3,262,533.00 - Financing: Facilities (H) Fund (2017 Bond Funds)

Dallas · 2019 · Introduced

Introduced July 17, 2019

Read the bill