Civicly

22-2373: Authorize a professional services contract with HDR Engineering, Inc. to prepare the City’s Long Range Water Supply Plan Study to the Year 2080 and beyond - Not to exceed $2,275,563.00 - Financing: Water Construction Fund

Dallas · 2022 · Introduced

Introduced October 3, 2022

Read the bill