19-1487: Authorize a professional services contract with TSIT Engineering & Consulting, LLC for engineering inspection and testing services for the Phase 2 Aquatic Facilities Projects at Bahama Beach Waterpark located at 1895 Campfire Circle, Exline Neighborhood Aquatic Center located at 2430 Eugene Street, and Harry Stone Neighborhood Aquatic Center located at 2403 Millmar Drive - Not to exceed $191,645.00 - Financing: Park and Recreation Facilities (B) Fund (2017 Bond Funds)
Dallas · 2019 · Introduced
Introduced September 24, 2019
Read the bill