Civicly

25-2539A: Authorize a design-build construction contract with Phoenix I Restoration and Construction, LLC for design and preconstruction services, an early construction package, and architectural and engineering services for the design and construction for the replacement of designated high roof areas and water infiltration mitigation at the Meyerson Symphony Center - Not to exceed $390,260.00 - Financing: Cultural and Performing Arts Facilities (E) Fund (2024 General Obligation Bond Fund)

Dallas · 2025 · Introduced

Introduced August 12, 2025

Read the bill