25-765A: Authorize a professional services contract with Brown and Caldwell to provide engineering services associated with a chemical optimization and corrosion control study of the City of Dallas water treatment and distribution system - Not to exceed $3,042,487.00 - Financing: Water Construction Fund
Dallas · 2025 · Introduced
Introduced February 18, 2025
Read the bill