21-443: Authorize a construction services contract for the Warranted Traffic Signal Installation Group 8, for traffic signal construction at the following four locations: Abrams Road at Eastridge Drive; Wheatland Road at Willoughby Boulevard; Pratt Street at Zang Boulevard; Audelia Road at Forestridge Drive - Roadway Solutions, Inc., lowest responsible bidder of four - Not to exceed $895,783.00 - Financing: Street and Transportation (A) Fund (2017 General Obligation Bond Funds)
Dallas · 2021 · Introduced
Introduced March 1, 2021
Read the bill