Civicly

26-324A: Authorize a decrease in the construction services contract with The Fain Group Inc. for the construction of Sylvan Discovery Gateway located between Irving Boulevard and Morris Street for design revisions to the project scope and an increase in duration of required traffic control needed for completion of the design revisions - Not to exceed ($624,775.24), from $4,243,017.79 to $3,618,242.55 - Financing: Park and Recreation Facilities (B) Fund (2017 General Obligation Bond Fund)

Dallas · 2026 · Introduced

Introduced January 13, 2026

Read the bill