19-292: Authorize a professional services contract with Gresham Smith for the engineering design of Erosion Control Contract No. B (list attached to the Agenda Information Sheet) - Not to exceed $635,394.30 - Financing: Flood Control (D) Fund (2017 Bond Funds)
Dallas · 2019 · Introduced
Introduced February 8, 2019
Read the bill