Civicly

19-379: Authorize a professional services contract with HDR Engineering, Inc. for the engineering design of Storm Drainage Contract No. 1 for the Pensive Drive Channel and Walnut Hill Lane Storm Drainage System - Not to exceed $1,066,050.69 - Financing: Storm Drainage Management Capital Construction Fund

Dallas · 2019 · Introduced

Introduced February 27, 2019

Read the bill