26-2409A: Authorize a design-build construction contract with Chamberlin Dallas, LLC for design and preconstruction services, an early construction package, and architectural and engineering services for the design and construction of the roof replacement and water infiltration mitigation at Bath House Cultural Center and South Dallas Cultural Center - Not to exceed $396,576.00 - Financing: Cultural and Performing Arts Facilities (E) Fund (2024 General Obligation Bond Fund) *In alignment with Bond Implementation Program.
Dallas · 2026 · Introduced
Introduced July 20, 2026
Read the bill